Renewable Elec Supply and Part L

Part L2 of the Building Regulations (2006 edition).
VirtualEngineer
VE Beginner
VE Beginner
Posts: 10
Joined: Mon Jan 05, 2015 11:10 am

Renewable Elec Supply and Part L

Postby VirtualEngineer » Thu Oct 12, 2017 9:44 am

Hi all

I was asked a question the other day that I wasn't sure about and can't find much info on, so thought I'd open it up to the VE forum to see if an EAs have an answer.

If our client, an owner operator, has a 100% renewable 'green' electricity supply, do the electrical services used in the SBEM/DSM still use the carbon factor 0.519 kgCO2/kWh ?

I think so because they could change supplier or supply, but can't find much evidence support my thoughts.

Any ideas?

Thanks

VEng

Icho
VE Newbie
VE Newbie
Posts: 4
Joined: Thu Mar 10, 2016 10:42 am

Re: Renewable Elec Supply and Part L

Postby Icho » Tue Oct 17, 2017 2:11 pm

Hi, your gut feeling is right. When using grid-supplied electricity, we should stick to the 0.519 as specified in the NCM Modelling guide. I think this value is the average carbon factor for the grid back in 2013 as calculated by the now defunct DEFRA.