Search found 1 match

by GEDS
Mon Jul 02, 2012 4:11 am
Forum: ASHRAE 90.1 App. G - PRM
Topic: Baseline Equipment Type
Replies: 0
Views: 31378

Baseline Equipment Type

Hi,

I'm currently doing ASHRAE PRM simulation for LEED. We need to use System#6 for the Baseline case. I have total of 8 networks.

My problem now is the cooling plant in the sizing report shows 0m2 area served for all the equipment even the cooling coil are all set. I dont know this is normal or ...