Hi
I am facing an issue with construction lines which is that by selecting a point of a surface, it does not start from 0,0 rather from some other point.
Lets say, a window of 1.1m X 2.5m needs to be place exactly 0.65m from a point. When using construction line, its starts measuring from a random number other than 0,0, so in the case above it might start at 61.25m.
How do you set the properties of construction line?
Construction Lines
- Complex Potential
- VE Expert

- Posts: 467
- Joined: Wed Jan 09, 2013 11:57 am
- Location: Bristol, UK
Re: Construction Lines
I believe this is a bug with the current version of IES. I would expect it to get fixed in the next update.
As a work around I have been constructing geometry in IES 2014 (where the construction lines work as intended) and then exporting the GEM file to IES 2015.
As a work around I have been constructing geometry in IES 2014 (where the construction lines work as intended) and then exporting the GEM file to IES 2015.
- JohnM
- Site Admin

- Posts: 56
- Joined: Tue Jun 12, 2012 4:00 pm
- Location: IES Head Office, Glasgow, UK
- Contact:
Re: Construction Lines
Hey guys,
This has been fixed for VE 2015 Feature Pack 2 which is due out very soon.
Regards,
John
This has been fixed for VE 2015 Feature Pack 2 which is due out very soon.
Regards,
John
IES Software Development
Re: Construction Lines
I'm waiting for this fix for a long time 