Achieving compliance with glazed high usage doors

Part L2 of the Building Regulations (2006 edition).
Post Reply
jerry
VE Graduate
VE Graduate
Posts: 58
Joined: Tue Apr 27, 2010 2:39 pm

Achieving compliance with glazed high usage doors

Post by jerry »

Given that IES requires fully glazed doors to be entered as windows, how do I get the compliance checker to stop reporting that my fully glazed pedestrian entrance door is not failing the U-value test, because it is actually a high usage door ?!
Surely its time IES was fixed to enable doors to be entered as doors, no matter what their construction.

Jerry
jerry
VE Graduate
VE Graduate
Posts: 58
Joined: Tue Apr 27, 2010 2:39 pm

Re: Achieving compliance with glazed high usage doors

Post by jerry »

Thanks Parklife. That's something, but I am still using 6.1.1 for 2006 projects. I read something about 6.2 being backwardly compatible, but I'm not sure how well this works. Can I go over to 6.2 and carry on working on 2006 projects ?

Jerry
Post Reply