It would be great if the simulations run through both the Parametric Tool and Hone could take advantage of the new Tasks system to run in parallel. These two tools, even more that before, could take advantage of parallel simulation since there are often so many simulations that need to be run.
User avatar
PCully
Site Admin
Site Admin
Posts: 1465
Joined: Tue Sep 09, 2008 9:52 am

Re: Parallel Sims in Parametric Tool & Hone

Post by PCully »

you can run multiple simulations in parallel (although not with the benefit of the Parallel Sim Manager Tasks interface to monitor progress)

from the guide

4.8.2 Configure Simulation and Optimisation Options
The user may now configure the following options relating to the simulation engine and optimisation
routine:
 Simulation Control: Specify the number of Apache simulations to run in parallel (more
simulation = more CPU cores and utilisation rate, and quicker convergence time). The
example shown in the figure below is using 4 CPU Cores.

Phil
IES Worldwide Technical Support
bbrannon4
VE Professor
VE Professor
Posts: 111
Joined: Wed Feb 12, 2014 6:56 pm

Re: Parallel Sims in Parametric Tool & Hone

Post by bbrannon4 »

Perfect, thanks!
Post Reply