Create target construction
Posted: Tue Oct 18, 2011 2:02 am
by XYE
Hi!
I'd like to ask about the Project constructions > Tools tab.
How do you specify/determine a value for the Target cM value?
Thanks,
Xye

Re: Create target construction
Posted: Tue Oct 18, 2011 9:38 am
by PCully
Hi,
This is the SBEM Thermal Capacity, as far as I am aware it is only really used by UK Compliance regulations. It is based on the Construction density, thickness and specific heat capacity, more info can be obtained from the iSBEM user guides which you can download from the BRE NCM website
http://www.ncm.bre.co.uk/.
Phil
Re: Create target construction
Posted: Wed Oct 19, 2011 6:20 am
by XYE
Hi Phil,
Thanks for the reply. What I mean is, in the Create target construction tab, you can input the u-value that you want, say, 0.504 W/(m²-K), but how about the corresponding cM value? How do you determine this, or can you just accept the default value for it?
Thanks,
Xye
Re: Create target construction
Posted: Wed Oct 19, 2011 10:09 am
by PCully
Hi,
Yes sorry was trying to get across that unless you will be doing UK Regs Compliance assessments (in which case the NCM site will give you all the info you need for this input) then you can just ignore and leave as default. I did a quick test simulation with different Cm values but the same U-value and results came out the same so I don't think it's something you need to worry over.
Phil
Re: Create target construction
Posted: Wed Oct 26, 2011 2:07 am
by XYE
Hi Phil,
Alright then. Thanks very much.
Xye