CHP in DSM
Posted: Tue Feb 04, 2014 11:39 am
Hiya... again!
I am doing an assessment on a development where there is a central plant with CHP. The part I am assessing is only a small section of the whole site.
In DSM we are asked for the thermal output of the CHP. I have this, but as it is such a large site, and therefore such a large CHP, if I enter the actual CHP thermal output, then the heat demand from assessed part of the site never actually reaches the output of the CHP. Therefore IES assumes the CHP is never running and I therefore have no benefit from the CHP.
I was wondering if anyone else has come across this problem and how they solved it. I think my options are:
- use a district heating option and adjust the fuel factor to suit. Here I am worried that the fuel factor is carried through to the notional, and therefore it wont make compliance any easier.
- only take a percentage of the CHP output - Maybe the as a percentage of the floor area?
Many thanks in advance
I am doing an assessment on a development where there is a central plant with CHP. The part I am assessing is only a small section of the whole site.
In DSM we are asked for the thermal output of the CHP. I have this, but as it is such a large site, and therefore such a large CHP, if I enter the actual CHP thermal output, then the heat demand from assessed part of the site never actually reaches the output of the CHP. Therefore IES assumes the CHP is never running and I therefore have no benefit from the CHP.
I was wondering if anyone else has come across this problem and how they solved it. I think my options are:
- use a district heating option and adjust the fuel factor to suit. Here I am worried that the fuel factor is carried through to the notional, and therefore it wont make compliance any easier.
- only take a percentage of the CHP output - Maybe the as a percentage of the floor area?
Many thanks in advance