CHP in IES ApacheSim Compliance
Posted: Tue Jan 10, 2017 12:09 am
I have a building where a CHP system is used to generate 100% of the design hot water demand. This demand has been calculated using guidance from CIBSE and relative British Standards and the CHP system has been sized accordingly.
The assumptions of the NCM assume a much higher hot water demand than that as calculated with guidance from CIBSE and British Standards. When producing a compliance model in SBEM this difference between real design hot water demand and NCM assumed hot water demand would not matter because the all CHP input parameters are efficiencies and percentages.
However, my building is level 5 complexity and as such I must use DSM compliance software. But CHP input parameters in IES ApacheSim Compliance require an absolute CHP capacity. If I state the CHP size as designed for the real hot water demand it will not be large enough to provide 100% of the notional hot water demand and therefore in my IES ApacheSim Compliance model a portion of the hot water demand will be met by other means.
Please can you tell me how you would advise an assessor to model this situation in IES ApacheSim Compliance.
Many thanks
The assumptions of the NCM assume a much higher hot water demand than that as calculated with guidance from CIBSE and British Standards. When producing a compliance model in SBEM this difference between real design hot water demand and NCM assumed hot water demand would not matter because the all CHP input parameters are efficiencies and percentages.
However, my building is level 5 complexity and as such I must use DSM compliance software. But CHP input parameters in IES ApacheSim Compliance require an absolute CHP capacity. If I state the CHP size as designed for the real hot water demand it will not be large enough to provide 100% of the notional hot water demand and therefore in my IES ApacheSim Compliance model a portion of the hot water demand will be met by other means.
Please can you tell me how you would advise an assessor to model this situation in IES ApacheSim Compliance.
Many thanks