Page 1 of 1

Construction Lines

Posted: Tue Dec 22, 2015 9:49 am
by junaidbinnaseer
Hi

I am facing an issue with construction lines which is that by selecting a point of a surface, it does not start from 0,0 rather from some other point.
Lets say, a window of 1.1m X 2.5m needs to be place exactly 0.65m from a point. When using construction line, its starts measuring from a random number other than 0,0, so in the case above it might start at 61.25m.

How do you set the properties of construction line?

Re: Construction Lines

Posted: Tue Dec 22, 2015 12:32 pm
by Complex Potential
I believe this is a bug with the current version of IES. I would expect it to get fixed in the next update.

As a work around I have been constructing geometry in IES 2014 (where the construction lines work as intended) and then exporting the GEM file to IES 2015.

Re: Construction Lines

Posted: Wed Dec 23, 2015 8:32 am
by JohnM
Hey guys,

This has been fixed for VE 2015 Feature Pack 2 which is due out very soon.

Regards,
John

Re: Construction Lines

Posted: Thu Dec 31, 2015 8:51 am
by lutinfr
I'm waiting for this fix for a long time :roll: